Nuclear Power — Online Biofilm Removal in CCW Exchangers
CASE STUDY · NUCLEAR POWER · US

Online biofilm removal and heat-transfer recovery in nuclear service water CCW exchangers — NRC shutdown avoided

Avoided: $27M+
$20M in lost revenue
Avoided downtime
$7M engineering + new HX
Avoided capex
< 2 days
ROI · consulting
14 days
ROI · consulting + chem

What this case study covers

A US nuclear plant's CCW exchangers were losing heat transfer to biofilm. Standard options — bleach, H₂O₂, surfactant biodispersants — were all ruled out by plant constraints. Mechanical cleaning meant shutdown.

Inside this case study

← Back to Power Generation Case Study
📄

Download the Full Case Study

Free · PDF · No spam

Your download is ready

Thank you. Click the button below to download the full case study PDF.

Download PDF

Jim may also be in touch — feel free to reply directly with any questions.

🔒 No spam · Independent advisory · No chemistry sold

Independent · Vendor-Neutral

Have a similar challenge at your facility?

Most assessments begin with a remote review. No vendor pitch — just engineering.

Schedule a Discovery Call