Case Studies

Real outcomes from independent, vendor-neutral cooling water consulting. No chemistry sold. No conflicts of interest. Every case represents a client system that deserved a second look.

Independent · No Chemistry Sold Director-Level Expertise US & Global Projects ROI Measured in Hours to Days

Seven Industries. Real Results.

Each case study represents a real engagement — anonymized to protect client confidentiality, but reflecting actual water chemistry, actual root causes, and actual measured outcomes.

All Industries Downstream Refining Petrochemical Power Generation Data Centers District Cooling Commercial & Institutional Food & Beverage
Downstream Refining · Gulf Coast
Gulf Coast refinery eliminates zinc silicate deposition in critical heat exchangers

A >250,000 BPD refinery was losing production to unexplained heat exchanger fouling despite a well-controlled zinc-phosphate program. Competing-ion saturation modeling found the root cause the standard tools couldn't see.

$38.45M / yr value ROI < 6 hours 202M gal/yr water saved
Read the full case study →
Downstream Refining · US
Every cooling report read “all green” — and the refinery’s heat exchangers kept failing every year

Cycles, chemistry, residuals, and general corrosion all sat in the green — yet the site replaced failed exchangers every year at a cost of millions. An independent review found 127 mpy of hidden pitting behind a <3 mpy general number, then rebuilt the metrics and baseline chemistry with the existing supplier.

Treatment cost −32% HX pitting failures eliminated Water use −20%
Read the full case study →
Petrochemical / Ethylene · Gulf / US
Eliminated transient calcium phosphate deposition in ethylene compressor intercoolers

Repeated unplanned cleanings and plant shutdown risk from bulk deposition events the incumbent supplier couldn't explain. Root cause found — a polymer-to-phosphate ratio imbalance driving transient deposition — recovering $16.1M/yr in firm savings and cost avoidance.

$16.1M / yr value Deposition eliminated Shutdown risk removed
Read the full case study →
Power Generation · Nuclear · US
Online biofilm removal and heat-transfer recovery in nuclear CCW exchangers

A US nuclear plant faced NRC-directed shutdown from CCW biofilm fouling. Bleach, peroxide, and surfactant dispersants were all ruled out. A novel stabilized bromine + dendrimer polymer approach restored heat transfer without shutdown.

$27M+ avoided Shutdown avoided ROI < 2 days
Read the full case study →
Data Centers · Hyperscale · ESG / WUE
Hyperscale data center improves WUE 25% and saves 136.8M gallons per year

A 3-CoC ceiling from a phosphate program was blocking campus expansion and driving poor WUE metrics. Program redesign to non-phosphate chemistry with advanced saturation modeling saved 136.8M gal/yr — Tier 3/4 availability maintained.

136.8M gal/yr saved 25% WUE improvement $150K/yr cost reduction
Read the full case study →
District Cooling · University Campus
EPA discharge risk and underground leaks resolved on 10,000+ ton campus loop — without shutdown

Continuous nitrite discharge to groundwater, a skin-sensitizing biocide EHS risk, and a deteriorating corrosion/microbial profile. $500K capex deferred, EPA exposure eliminated. Corrosion reduced 25×, microbial activity reduced 56×.

$500K+ capex avoided Corrosion 25× lower EPA exposure removed
Read the full case study →
Commercial & Institutional · Bakery · Midwest US
Severe biofilm contamination over open bakery production line — $10M+ risk avoided

An evaporative condenser above an open production line was overrun with yeast, SRBs, and biofilm — exposing products and staff, including Legionella risk. Combined mechanical and chemical cleanup restored biological control in a 3-day shutdown.

$10M+ avoided ROI < 4 hours Legionella risk eliminated
Read the full case study →
Food & Beverage · Additive Production · US
A deposit misdiagnosed as calcium phosphate was actually a calcium–HEDP salt — $1.7M/yr recovered

A 10,000 MT/yr food additive plant was losing throughput to heat-exchanger deposition the incumbent identified as calcium phosphate. Every phosphate-based fix failed. Competing-salt saturation modeling found the deposit was a calcium–HEDP salt from phosphonate overfeed — corrected with no capital.

$1.7M / yr value ~26× return 100% throughput restored
Read the full case study →
Water Treatment Services · Fortune 500
Fortune 500 Water Treatment Provider — +23% Operating Income

Eliminated a crippling pricing gap and restored competitiveness through win/loss analysis, product reformulation, and rationalization.

+23% Operating Income Product cost −70% Vitality Index <5% → 20%
Read the full case study →
Water Treatment Services · Sales Operations
AI sales forecasting takes landing accuracy from ±20% to ±0.4% vs target

A water treatment service company couldn't land its sales forecast — reps dropped expectations through the month, leaving a ±20% miss. Structured sales operations plus an AI forecasting layer in the CRM cut landing error to a fraction of a percent — worth ~$2.3M/yr plus $2.64M in freed working capital.

±20% → ±0.4% ~$2.3M/yr value $2.64M capital freed
Read the full case study →
Water Treatment Services · Product Development
Patented closed-loop inhibitor reformulated — 70% cost cut, fastest-growing product in its class

A global producer launched a patented closed-loop corrosion inhibitor to retain top accounts — but at 2–3x standard cost, no one would buy it, and it sold at a negative margin for two years. A formulation and application review found it overengineered and mis-engineered. Reformulated, it hit 70% gross margin at nitrite parity and became the fastest-growing closed-loop product globally.

−70% material cost 70% gross margin Fastest-growing in 6 mo
Read the full case study →
Water Treatment Services · Product Launch / Marketing
Patented product with zero sales becomes the fastest-growing product in the company

A Fortune 500 supplier had a patented, differentiated technology it couldn't sell — zero sales, zero trials, positioned around a discharge limit that didn't exist. A rebuilt 7-step marketing and launch process fixed the foundation — customer, competition, positioning, validated value — lifting margin 26%, beating Year 1 and Year 2 growth targets by 30%, and delivering the fastest-growing product in the company.

+26% margin 130% of growth target, Yr 1 & 2 Fastest-growing product
Read the full case study →