Refinery cooling towers and process heat exchangers — all reports green, exchangers still failing
CASE STUDY · DOWNSTREAM REFINING

Every cooling report read “all green” — and the heat exchangers kept failing

32% cost cut · HX failures eliminated
32%
Treatment cost reduced
127 → 0
mpy pitting, then eliminated
20%
Water usage reduced
None
Plant capital required

What this case study covers

A refinery's cooling program showed every metric green — cycles, chemistry, residuals, and general corrosion — yet the site kept failing heat exchangers every year at a cost of millions. An independent review found 127 mpy of hidden pitting behind a healthy-looking <3 mpy general number, rebuilt the metrics and baseline chemistry with the existing supplier, and eliminated the failures.

Inside this case study

← Back to Refinery Cooling Case Study
📄

Download the Full Case Study

Free · PDF · No spam

Your download is ready

Thank you. Click the button below to download the full case study PDF.

Download PDF

Jim may also be in touch — feel free to reply directly with any questions.

🔒 No spam · Independent advisory · No chemistry sold

Independent · Vendor-Neutral

Have a similar challenge at your facility?

Most assessments begin with a remote review. No vendor pitch — just engineering.

Schedule a Discovery Call