Gulf Coast Refinery — Zinc Silicate Case Study
CASE STUDY · REFINING · GULF COAST

Gulf Coast refinery eliminates zinc silicate deposition in critical heat exchangers

Annual Value Delivered: $38.45M / yr
2.5% · ~$36.27M / yr
Production increase
202.3M gal / yr
Water saved
1.5% · ~$2.18M / yr
Energy reduction
< 6 hours
ROI

What this case study covers

A >250,000 BPD Gulf Coast refinery was losing production capacity to deposition in critical heat exchangers — despite a well-controlled zinc-phosphate program. The root cause was a salt the standard prediction tools were not built to see.

Inside this case study

← Back to Refinery Case Study
📄

Download the Full Case Study

Free · PDF · No spam

Your download is ready

Thank you. Click the button below to download the full case study PDF.

Download PDF

Jim may also be in touch — feel free to reply directly with any questions.

🔒 No spam · Independent advisory · No chemistry sold

Independent · Vendor-Neutral

Have a similar challenge at your facility?

Most assessments begin with a remote review. No vendor pitch — just engineering.

Schedule a Discovery Call