District Cooling — 10,000+ Ton Campus Loop
CASE STUDY · DISTRICT COOLING · UNIVERSITY CAMPUS

Underground leaks, EHS exposure and discharge risk resolved on a 10,000+ ton campus chilled-water loop — without shutdown

Capex Avoided: $500K+
$500K pipe project
Capex deferred
$103K–$293K / day removed
EPA exposure
25× lower (2.5 → <0.1 mpy)
Corrosion
56× lower (560 → <10 RLU)
ATP / microbial

What this case study covers

A 10,000+ ton university district cooling loop had underground piping leaks, continuous nitrite discharge to ground, and a skin-sensitizing biocide handled weekly. Capital replacement was on the table.

Inside this case study

← Back to District Cooling Case Study
📄

Download the Full Case Study

Free · PDF · No spam

Your download is ready

Thank you. Click the button below to download the full case study PDF.

Download PDF

Jim may also be in touch — feel free to reply directly with any questions.

🔒 No spam · Independent advisory · No chemistry sold

Independent · Vendor-Neutral

Have a similar challenge at your facility?

Most assessments begin with a remote review. No vendor pitch — just engineering.

Schedule a Discovery Call