A refinery cooling tower ran a traditional alkaline phosphate program. The account manager who designed and implemented it had since moved to the customer side, where he managed the water treatment company’s contract, and he believed the program was excellent. In reality, mild steel was pitting at 52 mpy. The technical problem had to be fixed without making the contract owner look like he had done something wrong. Industrial Water Advisory resolved both.
The technical problem: the chemical program had to be corrected to deliver the contracted performance. Mild steel was pitting at 52 mpy.
The relationship problem: the person who designed the program now owned the contract on the customer side. The fix could not make him look like he had done something wrong.
The customer wasn’t unhappy, but the contract was ending and would be reviewed. Without fixing the technical issue, the service company’s business was in jeopardy.
Not galvanic. No copper was found inside the pits, so copper plating and galvanic corrosion were ruled out.
A 1:1 product swap. The copolymer was replaced with the terpolymer on a 1:1 product basis (ppm product in blowdown). That ignored two facts: the site needed only 50% as much active terpolymer to match or beat the copolymer, and the new product was 1.67× more concentrated. Together, 1.67 ÷ 0.5 = 334% of the dispersant actually needed.
The system got cleaned. The terpolymer lifted settled suspended solids and calcium phosphate and carried them through and out of the system.
Then it got too clean. At that dose, the terpolymer kept the metal surface so clean, and inhibited calcium phosphate and calcium carbonate so completely, that it effectively stopped the cathodic corrosion inhibition the program depended on. Pits formed and grew.
Value basis: 150,000 bpd refinery; 60,000 gpm tower, 15°F range, 5 cycles (~225 gpm blowdown, ~986M lb a year). Exchanger life: 12 carbon steel bundles at ~$120K installed retube each, a ~1.6-year life at 52 mpy pitting vs. a 20-year design life (~$0.83M a year). Leaks: 2 tube leaks a year avoided, each forcing a 10% rate cut for 3 days at a $13.85/bbl Gulf Coast cracking margin (October 2025, Worley Consulting via Oil & Gas Journal), ~$0.62M each. Polymer: 20 ppm product fed vs. ~6 ppm needed, 14 ppm excess at ~$3/lb (~$41K a year). Range ~$1.5M (1 leak a year) to ~$3.3M (at the October 2026 margin of $26.72/bbl). Excludes hydrocarbon-leak cleanup, environmental exposure, and the contract value retained. Actual value depends on exchanger count, throughput, and margin. Details generalized to protect client confidentiality.
Free PDF Download
Get the full case study
Baseline, root cause, the fix, and results — one page.
Independent technical review for refinery, petrochemical, and heavy-industry cooling water programs. We find the root cause, back the fix with data, and work with both the customer and the service company so the program performs and the relationship holds. No chemistry sold, no equipment sold.