Case Studies › Downstream Refining
Case StudyCooling Tower CorrosionDownstream Refining · USIndependent · No Chemistry Sold

The program looked excellent, and the coupons were shiny. Mild steel was pitting at 52 mpy.

A refinery cooling tower ran a traditional alkaline phosphate program. The account manager who designed and implemented it had since moved to the customer side, where he managed the water treatment company’s contract, and he believed the program was excellent. In reality, mild steel was pitting at 52 mpy. The technical problem had to be fixed without making the contract owner look like he had done something wrong. Industrial Water Advisory resolved both.

Asset
Refinery cooling tower
Program
Alkaline phosphate
Pitting
52 mpy → none
Root Cause
Polymer at 334% of need
Outcome
~$2.1M/yr protected
Challenge — Two Problems at Once

The technical problem: the chemical program had to be corrected to deliver the contracted performance. Mild steel was pitting at 52 mpy.

The relationship problem: the person who designed the program now owned the contract on the customer side. The fix could not make him look like he had done something wrong.

The customer wasn’t unhappy, but the contract was ending and would be reviewed. Without fixing the technical issue, the service company’s business was in jeopardy.

Intervention — What We Did
  • Focused the review on the 3 months before and 3 months after the dispersant change
  • Reviewed chemical feed rates and corrosion coupon results
  • Had the interior of the coupon pits analyzed
  • Modeled deposition and corrosion potential with proprietary saturation and kinetic modeling software
  • Worked with both the service company and the customer on the fix
The Program
  • An alkaline pH cooling tower program
  • Orthophosphate for mild steel corrosion control
  • Chloro-tolyltriazole for copper alloys
  • A polymeric calcium carbonate inhibitor
  • A terpolymer dispersant, recently switched from a copolymer
The Symptoms
  • Corrosion coupons were shiny and looked new, other than small pits
  • Mild steel pitting at 52 mpy
  • The contract owner believed the program was excellent
  • The contract was up for review
Root Cause Finding

Not galvanic. No copper was found inside the pits, so copper plating and galvanic corrosion were ruled out.

A 1:1 product swap. The copolymer was replaced with the terpolymer on a 1:1 product basis (ppm product in blowdown). That ignored two facts: the site needed only 50% as much active terpolymer to match or beat the copolymer, and the new product was 1.67× more concentrated. Together, 1.67 ÷ 0.5 = 334% of the dispersant actually needed.

The system got cleaned. The terpolymer lifted settled suspended solids and calcium phosphate and carried them through and out of the system.

Then it got too clean. At that dose, the terpolymer kept the metal surface so clean, and inhibited calcium phosphate and calcium carbonate so completely, that it effectively stopped the cathodic corrosion inhibition the program depended on. Pits formed and grew.

The Chemistry
  • Used the saturation and kinetic modeling as the justification for the change
  • Simplified the product feeds and changed the product mix
  • Set the dispersant on an actives basis, not a product basis
  • Reset the operating conditions and controls
The Relationship
  • Kept the finding on the conversion math, not the program design
  • Presented the model, not opinions, to both the service company and the customer
  • Gave the contract owner a data-backed optimization to stand behind
~$2.1M / yr
Exchanger life and leak risk protected, plus polymer the service company no longer has to feed, with no capital.
Mild Steel Pitting
52 mpy → none
Mild Steel General
<1 mpy
Copper
<0.1 mpy held
Dispersant Feed
334% → matched to need
Refinery
  • ~$0.83M/yr — carbon steel exchanger life protected. At 52 mpy, a 14 BWG (83 mil) tube wall perforates in about 1.6 years
  • ~$1.25M/yr — leak-driven rate cuts avoided
  • Contracted performance — delivered: mild steel under 1 mpy, no pitting, copper under 0.1 mpy
Service Company
  • Revenue maintained on a fixed-fee account, with higher profitability
  • ~$41K/yr — dispersant product no longer overfed
  • Positioned well for the contract review or any upcoming bid
  • Relationship intact with the contract owner

Value basis: 150,000 bpd refinery; 60,000 gpm tower, 15°F range, 5 cycles (~225 gpm blowdown, ~986M lb a year). Exchanger life: 12 carbon steel bundles at ~$120K installed retube each, a ~1.6-year life at 52 mpy pitting vs. a 20-year design life (~$0.83M a year). Leaks: 2 tube leaks a year avoided, each forcing a 10% rate cut for 3 days at a $13.85/bbl Gulf Coast cracking margin (October 2025, Worley Consulting via Oil & Gas Journal), ~$0.62M each. Polymer: 20 ppm product fed vs. ~6 ppm needed, 14 ppm excess at ~$3/lb (~$41K a year). Range ~$1.5M (1 leak a year) to ~$3.3M (at the October 2026 margin of $26.72/bbl). Excludes hydrocarbon-leak cleanup, environmental exposure, and the contract value retained. Actual value depends on exchanger count, throughput, and margin. Details generalized to protect client confidentiality.

Many times we think that overfeed of polymeric materials, even accidental, won’t cause harm in a system; it just adds cost. The truth is, the chemistry has to be in balance for the system to operate correctly and achieve the contractual targets. Let us help you optimize.

Free PDF Download

Get the full case study

Baseline, root cause, the fix, and results — one page.

Download PDF

A good relationship, and a program that isn’t performing?

Independent technical review for refinery, petrochemical, and heavy-industry cooling water programs. We find the root cause, back the fix with data, and work with both the customer and the service company so the program performs and the relationship holds. No chemistry sold, no equipment sold.